The pump track at Burnwood School, Staffordshire, constructed by Clark & Kent, was the first purpose-built track provided at any school in the UK.
The track is 120 metres long, two and three metres wide, and features asphalt turns, a start hill and return path, a stone sub-base and dolomite surfacing.
Route type: Pump track